Skip to content
MARVELOUS SWEATERSLtd · Est. 2007

MSL/03/3-1

IndexProducts

3.1Products

Pullovers & Crewnecks

The volume core of the floor. Crew, V, funnel and half-zip bodies in 3GG to 12GG, fully fashioned or cut-and-link.

Minimum per colour
300 pcs
Minimum per style
1,000 pcs
Sample lead time
10 – 14 days
Bulk lead time
60 – 75 days ex-yarn
3.1.1How we build it

Pullovers are what the factory was built around. Four hundred and twenty hand-driven flat beds and seventy auto jacquard machines means we can hold a single large programme on one gauge without starving the rest of the order book.

Necklines are linked on 14G, 8G or 6G dial linkers depending on the gauge of the panel, so the seam sits flat under a collar and does not read as bulk in a photograph. Shoulder joins, armholes and side seams are linked rather than overlocked wherever the construction allows.

We run repeat basics on annual contracts and seasonal drops side by side. For a repeat body we hold the block, the trim card and the wash recipe, so a re-order in month nine matches the shipment from month two.

Constructions

  • Fully fashioned
  • Cut and link
  • Set-in sleeve
  • Raglan
  • Saddle shoulder

Techniques

  • Plain stockinette
  • Half cardigan
  • Milano rib
  • Tipping
  • Contrast rib

Yarn qualities

  • Acrylic
  • Cotton
  • Wool blend
  • Lambswool
  • Acrylic / wool

Structure · 3GG stockinette

Pullovers & Crewnecks knit structure

Colourway · sampled from bulk

  • 969694
  • 434234
  • 93b3c9
  • c1bcb5

Commercial terms

Minimum per colour
300 pcs
Minimum per style
1,000 pcs
Sample lead time
10 – 14 days
Bulk lead time
60 – 75 days ex-yarn

Indicative. Final minimums and lead times are confirmed against the yarn quality, colour count and delivery window on your enquiry.

Quote this category
The knitting floor, machines running under supervision